SIMULATION & VIRTUAL COMMISSIONING

Prove it before you build it.

Run the experiment, find the bottleneck, debug the code, on a digital model, while changes are still cheap. PITCO builds and runs the simulations and virtual commissioning that take the risk out of an automation project.

THE TOOLS

Two tools, one idea:
decide on a model, not on the plant floor.

A plant simulation model of a production line, used to test material flow and throughput.

Plant Simulation

Plan with experiments, not guesses

A planning tool. Model material flow and overall plant performance, then run experiments against existing workstations and proposed new lines. See where the bottlenecks are and test how to clear them. The payoff: you test the outcome of a new plan before you order any machinery — and you find the constraints before they're built into the plant.

A digital twin used for virtual commissioning — control software and robot programs tested against a model.

Virtual Commissioning & Digital Twin

Start up software, not problems

A digital twin of your lines and machines. Controls software and robot programs are debugged against the twin before a PLC is wired or a robot is bolted down. Robots learn on the twin, not on your production floor. The code that ships is the code that's already been tested.

RUN AN EXPERIMENT

Model it first. Spend later.

An illustrated look at how a simulation engagement finds the constraint and proves the fix before any capital is committed.

01 / 04

Model the plant

Build a working model of the line — stations, flow, cycle times, the way it really runs.

02 / 04

Find the bottleneck

Run the model and watch where work piles up. The constraint shows itself.

03 / 04

Test a fix

Add a station, re-sequence, re-balance — and run the experiment again. Compare outcomes side by side.

04 / 04

Validate before you spend

You've tested the plan and seen the throughput and ROI — before a single machine is ordered.

WHO IT SERVES

Whichever side of the build you're on.

For Integrators

Virtual commissioning is now a standing RFQ requirement at Tesla, Mercedes-Benz, Volkswagen, and Ford — the most demanding manufacturers won't install equipment without it. Ship control software that's already been tested against the twin.

Integrator Services

For Manufacturers

Keep a digital twin of the lines and machines you've bought — for changeovers, what-if planning, operator retraining, and testing a change before you touch the running plant. Plant simulation turns your next investment decision into a tested one.

Manufacturer Services
THE VALUE

The value is defined upfront — that's the whole point.

Across published case studies, virtual commissioning typically cuts on-site startup time by 30–70%. Most commissioning pain is software pain: up to 90% of commissioning time is electrical and controls work, and up to 70% of that goes to software errors — exactly the work a digital twin lets you finish before you reach the floor.

30–70%

reduction in on-site startup time

Across published case studies — Siemens (Wipro PARI 70%, Estun 30%, Cleveland 50%), Volkswagen Navarra peer-reviewed study 66% (SAE Mobilus 2021-01-0240), Procedia Manufacturing controlled study 75%

~90%

of commissioning time is electrical & controls work

VDMA Virtual Commissioning Guideline (German Mechanical Engineering Industry Association / TU Dortmund IPS) — the canonical independent stat

200–800×

cost multiplier if an issue is caught after engineering vs. in the model

Kalypso, July 2022

NAMED CASE STUDIES — CITED SOURCES

  • Wipro PARI (engine assembly, India) — 70% less on-site commissioning time; 40–50% less rework. Siemens Process Simulate + HiL. (Siemens case study)
  • Volkswagen Navarra (paint workshop, Spain) — 66% reduction in commissioning time; 16% less cycle-time loss. (SAE Mobilus 2021-01-0240 — peer-reviewed)
  • Cleveland Systems Engineering (UK) — design and commissioning time both halved (2 weeks → 1 week). (Siemens case study)
  • BMW Group (30+ plants) — paint-line simulations from 12 weeks down to 1–2 weeks; up to 30% planning-cost reduction projected. (BMW Group press release, June 2025)
GET STARTED

Have a plan, a line, or a build you'd like to test first?

Tell us what you'd like to test — an engineer will be in touch.